Project Description

Magna Engineers provided electrical, instrumentation, HVAC, and plumbing design services for the improvements to the existing South Shore Wastewater Treatment Plant.

The project included upgrades to electrical systems and controls, incuding new variable speed drives for oxidation ditches, blower controls, and clarifiers.  A new effluent flowmeter was provided.

The project included a new operations building including laboratory, offices, and restroom.  The new building was provided with LED lighting, power and communications, and split system HVAC system.

The project also included security cameras throughout the site for security and operations.